FM-JC-008 — Post-Signing Environmental Incoherence

Open archive search
Archive registry entry

FM-JC-008 — Post-Signing Environmental Incoherence

Post-Signing Environmental Incoherence occurs when a contract, agreement, settlement, governance commitment, platform term, labor arrangement, institutional obligation, AI authorization, compliance condition, or restoration agreement was accepted under one environmental state but later becomes incoherent because the surrounding conditions, burdens, risks, costs, dependencies, information, power distribution, or operational field changed enough that continued enforcement no longer preserves the agreement’s original consent, fairness, legitimacy, or coherence.

draftid: FM-JC-008version: 0.1.0updated: 2026-06-20
Archive Progress

This section can be read now; registry depth and cross-references are still being strengthened.

Foundation
Online

The section has a stable overview route and basic reader context.

Technical Layer
Online

A deeper technical overview is available.

Registry
Current

334 registry entries are available.

Cross-links
Curating

Related concepts are being connected conservatively for accuracy.

0. Justice Scope Note

This entry is conceptual and systems-oriented.

It does not treat every changed condition, price movement, changed burden, contract difficulty, changed market condition, operational surprise, platform update, governance shift, or post-signing inconvenience as a failure.

Agreements require some stability.

Contracts cannot be voided by every minor shift.

Obligations often persist through ordinary variation.

Risk allocation can be legitimate.

Some parties knowingly accept uncertainty.

Some terms are designed to survive changing conditions.

A coherent agreement may remain binding even when conditions change, if the change is within the expected risk envelope and does not destroy consent validity, proportionality, material fairness, or coherence.

The failure begins when the post-signing environment changes enough that continuing to enforce the original terms no longer preserves the agreement’s legitimacy.

Post-Signing Environmental Incoherence occurs when the agreement’s text remains stable but the field in which it operates has changed.

The problem is not change.

The problem is enforcing old agreement geometry after the environment that made it coherent has materially shifted.


1. Definition

Post-Signing Environmental Incoherence occurs when a contract, agreement, settlement, governance commitment, platform term, labor arrangement, institutional obligation, AI authorization, compliance condition, or restoration agreement was accepted under one environmental state but later becomes incoherent because the surrounding conditions, burdens, risks, costs, dependencies, information, power distribution, or operational field changed enough that continued enforcement no longer preserves the agreement’s original consent, fairness, legitimacy, or coherence.

The agreement may include:

  • contract
  • settlement
  • waiver
  • platform terms
  • labor agreement
  • consent form
  • data authorization
  • AI use authorization
  • model deployment agreement
  • institutional obligation
  • governance commitment
  • compliance condition
  • service agreement
  • vendor agreement
  • licensing agreement
  • nondisclosure agreement
  • arbitration agreement
  • safety agreement
  • access agreement
  • restoration agreement
  • reconciliation agreement
  • performance obligation
  • financial obligation
  • participation agreement

The environmental shift may include:

  • cost change
  • risk change
  • scope change
  • dependency change
  • power shift
  • platform lock-in
  • operational change
  • data use change
  • AI capability change
  • regulatory change
  • safety condition change
  • market change
  • supply change
  • labor burden change
  • health or capacity change
  • information discovery
  • hidden consequence becoming visible
  • new affected-class burden
  • technical architecture change
  • access condition change
  • governance regime change
  • emergency condition becoming baseline
  • performance context changing
  • available alternatives disappearing
  • exit cost rising

The core failure is:

textScroll
agreement formed under environment A
→ environment shifts to B
→ burden, risk, dependency, or meaning changes
→ original terms continue to be enforced
→ consent context and proportionality decay
→ hidden contract debt accumulates
→ coherence declines

Post-Signing Environmental Incoherence is not merely regret.

It is an agreement losing compatibility with the field that now carries it.


2. Core Pattern

The core pattern is:

  1. A contract, settlement, authorization, waiver, platform term, institutional obligation, or restoration agreement is accepted.
  2. The agreement is coherent enough under the original signing environment.
  3. The surrounding field changes materially.
  4. Burdens, risks, costs, dependencies, information, alternatives, access, or power relations shift.
  5. The agreement remains textually unchanged.
  6. The enforcing system treats the original signature or acceptance as sufficient.
  7. The affected node carries a burden that was not part of the original consent context.
  8. Renegotiation, exit, review, or modification is unavailable or resisted.
  9. The agreement becomes a hidden debt engine.
  10. Legitimacy decays because enforcement preserves text while ignoring changed reality.

A healthy system says:

textScroll
material environmental drift requires coherence review

A post-signing-incoherent system says:

textScroll
the agreement still binds because it was signed

The failure is especially important for long-running agreements.

Time can transform a fair agreement into an extractive one.

Platform architecture can change.

AI capabilities can change.

Data meanings can change.

Market conditions can change.

The party’s dependency can increase.

The cost of exit can rise.

The written agreement may be unchanged while its real-world meaning becomes different.


3. Failure Signature

Typical signature:

textScroll
environmental drift↑
agreement text stability↑
burden change↑
risk change↑
consent context integrity↓
renegotiation availability↓
exit viability↓
hidden contract debt↑
enforcement legitimacy↓
O↓

Extended signature:

textScroll
terms unchanged,
field transformed

signature valid then,
burden different now

scope stable in text,
scope expanded in reality

risk shifted,
review unavailable

contract enforced,
coherence lost

Common verbal signatures include:

textScroll
you agreed to this
the contract is clear
the terms have not changed
you accepted the risk
continued participation confirms acceptance
we cannot renegotiate every change
market conditions are not our responsibility
the agreement remains binding
you had the opportunity to decline
this is covered by the original terms
the policy allows this
the scope is broad enough
the contract anticipated changes

Common system signatures include:

textScroll
a platform changes its architecture while treating old user consent as valid for new data use
a labor agreement becomes capacity-inverting after workload or cost conditions change
a settlement remains sealed after new pattern evidence appears
a contract locks a weaker party into terms after market or dependency conditions shift
an AI authorization signed under one capability regime is used after model capability expands
a governance commitment is enforced after emergency conditions become baseline
a vendor agreement becomes unbalanced after access alternatives disappear
a compliance obligation expands in burden while review or renegotiation is unavailable
a restoration agreement continues after affected-state conditions change

The defining condition is not that circumstances changed.

The defining condition is that changed circumstances materially alter agreement meaning while enforcement refuses coherence review.


4. Primary U-Layer Origin

Common origin layers:

  • U1 — Power / Budgets: one party benefits from enforcing old terms under new conditions.
  • U2 — Configuration / Boundaries: contract scope, exit, review, or modification boundaries are too rigid.
  • U3 — Execution / Runtime: terms continue to execute while field compatibility decays.
  • U4 — Information / Truth: original agreement is narrated as still fully valid.
  • U5 — Coordination / Time: drift accumulates across time without review.
  • U6 — Coherence Field: legitimacy is preserved through textual certainty despite changed reality.
  • U7 — Memory / Recurrence: the signing moment becomes official memory while field changes are forgotten.
  • U8 — Environment / Field: external environmental shift changes the meaning of obligations.

Common manifestation layers:

  • U2 — Boundaries: exit, renegotiation, and scope boundaries lock.
  • U3 — Execution: agreement continues operating.
  • U4 — Truth: signature remains the legitimacy anchor.
  • U5 — Time: drift accumulates.
  • U8 — Environment: the surrounding field no longer matches the agreement.

Post-Signing Environmental Incoherence is primarily a Τ / Λ / K / H failure.

Time changes the field.

Compatibility decays.

Load shifts.

Hidden contract debt accumulates.


5. Typical Development Sequence

A common development sequence is:

  1. Agreement is formed under initial conditions.
  2. Consent, proportionality, and burden are acceptable or at least legible at signing.
  3. Time passes.
  4. Environmental conditions shift.
  5. The burden or risk of the agreement changes.
  6. The party benefiting from enforcement invokes the original terms.
  7. The burdened party seeks review, renegotiation, exit, or modification.
  8. Review is denied because the agreement is already signed.
  9. Enforcement continues.
  10. Hidden debt accumulates.
  11. The agreement becomes less legitimate with each unreviewed drift.
  12. Conflict, collapse, extraction, or forced exit becomes more likely.

The loop often looks like:

textScroll
agreement → field drift → burden shift → enforcement → debt → legitimacy decay

Another common loop is:

textScroll
renegotiation requested → original signature cited → exit cost rises → forced compliance

Post-Signing Environmental Incoherence becomes durable when a system treats the signing moment as the only legitimacy event, rather than one point in a continuing coherence relation.


6. Diagnostic Markers

Diagnostic markers include:

  • Agreement text remains stable while real burden changes.
  • The system invokes original consent despite new material conditions.
  • Renegotiation is unavailable or punitive.
  • Exit cost has increased since signing.
  • Scope has expanded in practice but not in text.
  • Risk was latent, hidden, or unknowable at signing.
  • The agreement is enforced after dependency increases.
  • New technology changes the meaning of old authorization.
  • Environmental change benefits one party and burdens another.
  • The system treats changed conditions as irrelevant.
  • Contractual certainty is prioritized over coherence.
  • Modification mechanisms are too narrow for real field drift.
  • The affected party carries debt created after signing.
  • Continued compliance is treated as renewed consent despite lock-in.

Useful diagnostics:

  • Environmental Compatibility: Tests whether the agreement remains compatible with current conditions.
  • Material Condition Drift: Measures how far the environment has shifted since signing.
  • Consent Context Integrity: Measures whether original consent conditions still hold.
  • Burden Drift: Tracks changes in load, cost, risk, or dependency.
  • Obligation Proportionality: Tests whether obligations remain proportionate.
  • Renegotiation Availability: Measures whether review or modification is possible.
  • Exit Cost Drift: Tracks whether exit became more expensive or impossible.
  • Post-Signing Hidden Debt: Measures debt created after agreement formation.
  • Enforcement Coherence: Tests whether enforcement preserves justice or only text.
  • Agreement Legitimacy Under Drift: Measures whether legitimacy survives environmental change.

Relevant gates include:

  • Environmental Compatibility Gate: Fails when the agreement no longer fits the field.
  • Changed Conditions Gate: Fails when material change does not trigger review.
  • Consent Context Gate: Fails when original consent conditions no longer hold.
  • Renegotiation Gate: Fails when review or modification is blocked.
  • Burden Drift Gate: Fails when burden shifts are not counted.
  • Proportionality Gate: Fails when obligations become disproportionate.
  • Exit Preservation Gate: Fails when exit becomes unavailable or too costly.
  • Contract Auditability Gate: Fails when drift cannot be inspected.
  • Hidden Debt Gate: Fails when post-signing burden is not counted.
  • Legitimacy Revalidation Gate: Fails when enforcement continues without updated legitimacy.

The first common gate failure is usually the Environmental Compatibility Gate.

Once the agreement is no longer compatible with the surrounding field, continuing to enforce it without review converts contract into coherence debt.


Relevant operators include:

  • Τ — Trajectory / Time: Primary operator; agreement meaning changes across time.
  • Λ — Compatibility: Tests whether terms remain compatible with the current field.
  • K — Constraint / Load: Load shifts after signing.
  • H — Hidden Debt: Post-signing burden accumulates under original terms.
  • O — Coherence: Declines when enforcement ignores environmental drift.
  • E — Exit: Exit may degrade after signing.
  • Au — Auditability: Needed to verify material change and burden drift.
  • BΣ — Boundary Integrity: Scope and obligation boundaries may expand in practice.
  • M — Meaning: “You agreed” language preserves old legitimacy despite changed context.
  • Γ — Selection: Selects enforcement interpretations favorable to the advantaged party.
  • Φ — Flow / Resource Movement: Resource, risk, or data flows shift after signing.
  • R — Restoration Capacity: Needed to repair drift through renegotiation or release.
  • Ψ — Observation / Interface: Displays stable contract terms while hiding field drift.
  • D — Damping: Can slow abrupt enforcement or suppress renegotiation pressure.

Common operator pattern:

textScroll
Τ changes field
Λ compatibility↓
K burden↑
E exit↓
M cites signature
H↑
O↓

The core operator inversion is:

textScroll
old consent is used to authorize a new field reality

instead of:

textScroll
material field change triggers consent and contract coherence review

Post-Signing Environmental Incoherence converts agreement stability into hidden burden when environment shifts.


  • Agreements Must Remain Coherent Across Changed Conditions: contracts need environmental compatibility.
  • Consent Conditions Can Drift After Signing: consent context is not frozen forever.
  • Contract Legitimacy Requires Environmental Compatibility: legitimacy depends on field fit.
  • Obligation Must Remain Proportionate to the Field: burden changes require review.
  • Changed Conditions Require Review: material environmental drift must trigger audit.
  • Renegotiation Must Remain Available Under Material Drift: no agreement should trap incoherence.
  • Enforcement Must Preserve Coherence, Not Only Text: textual enforcement can become unjust.
  • Hidden Burden Created After Signing Must Be Counted: new burdens create debt.
  • Manufactured Consent: old consent can become manufactured when conditions change.
  • Locked-In Renegotiation Failure: inability to renegotiate traps drift.
  • Parasitic Contracting: changed conditions can create extraction.
  • Hidden Debt Accumulation: uncounted post-signing burden accumulates.
  • Contract Terms Must Remain Environment-Compatible: agreement must fit the field it operates in.
  • Material Environmental Drift Requires Review: significant change triggers revalidation.
  • Consent Context Must Be Preserved or Revalidated: consent cannot be assumed when context changes.
  • Changed Burden Must Be Audited: load changes after signing must be counted.
  • Enforcement Must Not Ignore Field Change: justice cannot be reduced to text.
  • Renegotiation Pathways Must Survive Drift: review must remain possible.
  • Post-Signing Debt Must Be Counted: burden created after agreement formation is real.
  • Agreement Legitimacy Requires Ongoing Coherence: legitimacy persists only if conditions remain coherent.

10. Common False Positives

Not every changed condition creates Post-Signing Environmental Incoherence.

Common false positives include:

  • Ordinary market variation within the agreed risk envelope.
  • Known risks explicitly accepted with meaningful alternatives.
  • Minor burden changes that do not alter consent, proportionality, or legitimacy.
  • Contracts with fair, accessible adjustment mechanisms.
  • Agreements where both parties retain meaningful exit.
  • Environmental changes that affect both parties symmetrically and proportionately.
  • Terms designed for variable conditions and understood at signing.
  • Temporary hardship with adequate relief pathway.
  • Platform updates within clearly authorized scope.
  • AI or data use changes that remain within bounded, informed consent.
  • Settlement terms that remain compatible with new evidence because reopening clauses exist.

Clarifying rule:

This is not Post-Signing Environmental Incoherence unless changed conditions materially alter burden, risk, scope, dependency, power, information, exit, or consent context while enforcement refuses review or revalidation.

Agreements can survive change.

They fail when change transforms the agreement’s coherence and the system pretends nothing changed.


11. Common False Repairs

Common false repairs include:

  • citing the original signature again
  • adding explanatory language without modifying burden
  • offering a narrow amendment that does not address field change
  • allowing renegotiation only at punitive cost
  • treating continued performance as re-consent
  • saying the contract anticipated all changes
  • adding a hardship form with no remedy authority
  • offering symbolic flexibility while preserving extraction
  • creating a review committee that cannot change terms
  • changing notice language while preserving scope expansion
  • requiring the burdened party to prove every environmental change
  • framing renegotiation requests as bad faith
  • allowing exit only through severe penalty
  • updating terms unilaterally
  • treating silence after changed conditions as acceptance

False repair often produces the loop:

textScroll
environmental incoherence exposed
→ original terms cited
→ renegotiation denied
→ hidden contract debt grows

Another common loop is:

textScroll
field changes
→ burden rises
→ affected party seeks review
→ exit cost invoked
→ compliance continues under debt

The repair fails because it preserves the signing event instead of restoring environmental compatibility.


12. Restoration Direction

Restoration requires auditing changed conditions, revalidating consent context, measuring burden drift, reopening renegotiation where material drift exists, restoring exit or proportionality, and repairing hidden debt created after signing.

Primary restoration direction:

textScroll
revalidate the agreement against the field it now operates in

A fuller restoration path includes:

  1. Name the agreement. Identify the contract, settlement, authorization, waiver, platform term, labor agreement, or governance commitment.
  2. Define the signing environment. Record conditions, burdens, risks, alternatives, and consent context at acceptance.
  3. Map current environment. Identify what changed in cost, risk, dependency, technology, information, power, scope, or access.
  4. Test materiality. Determine whether the change alters consent, fairness, proportionality, or legitimacy.
  5. Audit burden drift. Measure new load created after signing.
  6. Audit exit drift. Determine whether exit became harder or impossible.
  7. Audit scope drift. Determine whether real-world use expanded beyond original meaning.
  8. Count hidden contract debt. Identify debt created by continued enforcement under changed conditions.
  9. Open renegotiation. Provide review or modification pathways where drift is material.
  10. Revalidate consent. Obtain renewed consent under current conditions where needed.
  11. Restore proportionality. Adjust obligations, remedies, timelines, cost, access, or scope.
  12. Repair affected burden. Address harm caused by incoherent enforcement.
  13. Preserve future drift review. Add triggers for future environmental change.
  14. Revalidate legitimacy. Continue enforcement only where updated coherence is verified.

A valid restoration path should reduce:

textScroll
environmental incompatibility
burden drift
exit cost drift
scope drift
renegotiation blockage
post-signing hidden debt
consent context decay
enforcement incoherence
legitimacy overclaim

Post-Signing Environmental Incoherence is not repaired by pointing back to the signing moment.

It is repaired by testing whether the agreement is still coherent now.


  • Justice: Primary family; enforcement loses legitimacy when changed conditions make the agreement incoherent.
  • Contracts: Core contract failure mode; text may remain stable while environmental meaning changes.
  • Restoration: Settlements, repair agreements, and reconciliation terms can become incoherent if affected-state conditions change.
  • Governance: Governance commitments and emergency arrangements can drift as environments change.
  • Institutions: Institutional obligations can become unfair or impossible when capacity, role, risk, or dependency changes.
  • Platforms: Platform terms, data use, moderation rules, and account obligations can become incoherent after architecture or dependency changes.
  • Security: Security authorizations and emergency restrictions can become incoherent after threat conditions shift.
  • AI Governance: AI capability growth can invalidate old data, model, delegation, or deployment authorizations.
  • Labor: Workload, dependency, risk, or capacity changes can make prior labor agreement terms incoherent.
  • Economy: Market and resource shifts can transform proportional terms into extraction.
  • Interactions: Strongly linked to Consent Drift, Scope Creep, Exit Denial, and Forced Coupling.
  • Coherence: Coherence requires agreement legitimacy to remain compatible with current conditions.

14. Relationship to Parent / Child Modes

Production treatment: Standalone Entry

This mode maps upward to:

  • FM-JC-007 — Manufactured Consent
  • FM-JC-011 — Locked-In Renegotiation Failure
  • FM-JC-012 — Parasitic Contracting
  • FM-ISC-009 — Consent Drift
  • FM-CORE-002 — Hidden Debt Accumulation

Sibling or related Justice & Contract modes include:

  • FM-JC-001 — Procedural Theater
  • FM-JC-002 — Selective Enforcement
  • FM-JC-004 — Under-Resourced Justice
  • FM-JC-006 — Emergency Normalization
  • FM-JC-007 — Manufactured Consent
  • FM-JC-009 — Enforcement Capture
  • FM-JC-010 — Proxy-Relay Obfuscation
  • FM-JC-011 — Locked-In Renegotiation Failure
  • FM-JC-012 — Parasitic Contracting

Related Restoration modes include:

  • FM-R-012 — Capacity-Inverting Restoration
  • FM-R-013 — Victim Burden Inversion
  • FM-R-015 — Secret Settlement as Restoration
  • FM-R-016 — Reintegration Without Time Validation
  • FM-R-019 — Premature Closure

Related Security / Interaction modes include:

  • FM-ISC-009 — Consent Drift
  • FM-ISC-010 — Scope Creep
  • FM-ISC-012 — Restoration Lock-In
  • FM-ISC-021 — Gate Bypass Normalization
  • FM-SEC-004 — Consent Theater / Invalid Authorization
  • FM-SEC-010 — Emergency Normalization
  • FM-SEC-012 — Exit Failure / Recapture

Related cross-family modes include:

  • FM-CORE-002 — Hidden Debt Accumulation
  • FM-CORE-008 — Forced Coupling
  • FM-C-024 — Recapture After Exit
  • FM-ECOX-021 — Coercive Contract
  • FM-ECOX-022 — Dependency Lock-In
  • FM-ECOX-024 — Extraction Masking Instability
  • FM-AIX-022 — Dependency Loop Formation
  • FM-REI-004 — Incentive Backpropagation

Aliases preserved from source material:

  • Post-Signing Environmental Incoherence
  • Post-Agreement Environmental Incoherence
  • Contract Environment Drift
  • Agreement Environment Drift
  • Changed-Conditions Contract Failure
  • Post-Signing Coherence Failure
  • Environmental Contract Drift
  • Consent Context Drift
  • Agreement Context Collapse
  • Contractual Field Drift
  • Obligation Under Changed Conditions
  • Signed-Then-Shifted Incoherence

15. Minimal Entry Version

Definition: Post-Signing Environmental Incoherence occurs when a contract, agreement, settlement, governance commitment, platform term, labor arrangement, institutional obligation, AI authorization, compliance condition, or restoration agreement was accepted under one environmental state but later becomes incoherent because the surrounding conditions, burdens, risks, costs, dependencies, information, power distribution, or operational field changed enough that continued enforcement no longer preserves the agreement’s original consent, fairness, legitimacy, or coherence.

Signature:

textScroll
environmental drift↑
agreement text stability↑
burden change↑
risk change↑
consent context integrity↓
renegotiation availability↓
exit viability↓
hidden contract debt↑
enforcement legitimacy↓
O↓

Restoration direction:

  • name the agreement
  • define the signing environment
  • map current environment
  • test materiality
  • audit burden drift
  • audit exit drift
  • audit scope drift
  • count hidden contract debt
  • open renegotiation
  • revalidate consent
  • restore proportionality
  • repair affected burden
  • preserve future drift review
  • revalidate legitimacy

16. Machine-Readable Summary

yamlScroll
failure_mode:
  id: "FM-JC-008"
  name: "Post-Signing Environmental Incoherence"
  family: "Justice & Contracts"
  production_treatment: "Standalone Entry"
  source_lineage:
    - "Justice & Contracts"
    - "JGL Extended"
    - "Restoration / Justice / Contracts Family"
  parent_modes:
    - "FM-JC-007 — Manufactured Consent"
    - "FM-JC-011 — Locked-In Renegotiation Failure"
    - "FM-JC-012 — Parasitic Contracting"
    - "FM-ISC-009 — Consent Drift"
    - "FM-CORE-002 — Hidden Debt Accumulation"
  primary_failure: "A contract, agreement, settlement, governance commitment, platform term, labor arrangement, institutional obligation, AI authorization, compliance condition, or restoration agreement was accepted under one environmental state but later becomes incoherent because the surrounding conditions, burdens, risks, costs, dependencies, information, power distribution, or operational field changed enough that continued enforcement no longer preserves the agreement’s original consent, fairness, legitimacy, or coherence."
  scope_note: "Conceptual and systems-oriented; does not treat every changed condition, price movement, changed burden, contract difficulty, changed market condition, operational surprise, platform update, governance shift, or post-signing inconvenience as a failure."
  aliases:
    - "Post-Signing Environmental Incoherence"
    - "Post-Agreement Environmental Incoherence"
    - "Contract Environment Drift"
    - "Agreement Environment Drift"
    - "Changed-Conditions Contract Failure"
    - "Post-Signing Coherence Failure"
    - "Environmental Contract Drift"
    - "Consent Context Drift"
    - "Agreement Context Collapse"
    - "Contractual Field Drift"
    - "Obligation Under Changed Conditions"
    - "Signed-Then-Shifted Incoherence"
  signature:
    - "environmental drift↑"
    - "agreement text stability↑"
    - "burden change↑"
    - "risk change↑"
    - "consent context integrity↓"
    - "renegotiation availability↓"
    - "exit viability↓"
    - "hidden contract debt↑"
    - "enforcement legitimacy↓"
    - "O↓"
  primary_layers:
    origin:
      - "U1 — Power / Budgets"
      - "U2 — Configuration / Boundaries"
      - "U3 — Execution / Runtime"
      - "U4 — Information / Truth"
      - "U5 — Coordination / Time"
      - "U6 — Coherence Field"
      - "U7 — Memory / Recurrence"
      - "U8 — Environment / Field"
    manifestation:
      - "U2 — Boundaries"
      - "U3 — Execution"
      - "U4 — Truth"
      - "U5 — Time"
      - "U8 — Environment"
  state_variables:
    - "Τ"
    - "Λ"
    - "K"
    - "H"
    - "O"
    - "E"
    - "Au"
    - "BΣ"
    - "M"
    - "Γ"
    - "Φ"
    - "R"
    - "Ψ"
    - "D"
  first_gate_failure: "Environmental Compatibility Gate"
  restoration:
    - "Post-Signing Coherence Audit"
    - "Changed Conditions Review"
    - "Consent Context Revalidation"
    - "Burden Drift Accounting"
    - "Contract Compatibility Repair"
    - "Renegotiation Pathway Restoration"
    - "Exit Cost Review"
    - "Proportionality Rebalancing"
    - "Hidden Contract Debt Accounting"
    - "Agreement Legitimacy Revalidation"